Hello, welcome toXitao Polymer Co.,Ltd.!

Xitao Polymer Co.,Ltd.- PAM series products manufacturer

PAM series products manufacturer
010-60491833 60491602
Oilfield Chemical
Polymer for profile control
Location: Home>Oilfield Chemical>Polymer for profile control
Soluble plugging-gel system
Pubdate:2022-04-02

In the oilfield development and production, there are many horizontal wells with continuous perforation, poor cementing quality and easy casing change, which can not adopt the conventional mechanical segmented fracturing process, and there is the risk of pipe sticking.

Soluble plugging-gel staged fracturing technology adopts two process strings: plugging the top section and fracturing the bottom section, or plugging the bottom section and fracturing the top section. Injecting soluble plugging-gel system to the required plugging formation,and start fracturing after gelling.

Soluble plugging gel is a high molecular polymer. It can temporarily plug and fracture by adding crosslinker and gel breaker. It can adjust the plugging time under various conditions such as gel breaker and well temperature. After the polymer is dissolved, it has good fluidity and can be injected by pump. It can be gelled in the specified time for plugging, and can undertake a certain pressure and temperature.

Products vary according to well temperature and plugging time.

Product specification

-Temperature: suitable for 45-100

-Gelling time: 5-48 hours

-Well pressure: 30-70mpa

-Gel-break time: adjustable within 5-10 days

-Application: low pressure gas well fracturing, horizontal well staged perforation fracturing technology, water control in horizontal well. 


8613911651774